Planning guide

How to plan a home renovation.

What to decide, in what order, before you commit to a design or a builder.

A renovation goes well when the decisions are made in the right order. Here is the order we recommend to homeowners before they commit to a design or a builder.

01

Start with how you want to live, not with finishes

Before cabinets or tile, decide what the renovation has to fix. Is the kitchen too small for two cooks, is there no bathroom on the main floor, do the kids need bedrooms that are not in the basement? Write down the three problems you want gone in five years. A builder who understands those problems can suggest layouts you would not have thought of, and you will spend your budget on space and structure rather than on finishes that stop mattering after the first month.

02

Set a budget that includes the parts you cannot see

Most homeowners budget for the visible work and are surprised by what sits behind the walls: wiring, plumbing, insulation, and sometimes structural reinforcement. A realistic renovation budget leaves room for those items, for permits, and for a contingency of roughly ten percent. It also helps to know your ceiling before the first meeting. A builder can design to a number, but only if you name the number honestly.

03

Expect drawings and permits to take real time

Any project that moves walls, adds floor area or changes a window opening usually needs drawings and a building permit. On a typical renovation that phase runs a few weeks to a few months, depending on the municipality and the scope. Starting that paperwork early costs nothing extra and often saves a season, because good builders book their schedules weeks or months ahead.

04

Plan for living through the work

If you are staying in the house, the schedule matters as much as the design. Ask which weeks the kitchen will be unusable, where the temporary sink or bathroom will be, how dust will be contained and who cleans the site. A builder who works in occupied homes will already have answers, and those answers are a good sign of how the project will feel day to day.

05

Compare quotes on scope, not on the bottom line

The lowest number is often the thinnest scope. Read each quote for what it excludes: cabinetry, appliances, permits, disposal, painting, and whether the price holds if the drawings change. A fixed-scope quote that lists inclusions and exclusions line by line is easier to compare than a single figure, and it protects you from surprises once work starts.

06

Bring these things to a first meeting

Photos of rooms you like, a rough idea of your budget and timeline, and any survey or drawings you already have. If you have had other quotes, bring those too. With that in hand a builder can tell you quickly whether your plan fits your house and your budget, and what the next step would look like.